CSUSASE was selected for a design-build project for LG Electronics’ new 100,000 square foot assembly plant in Huntsville, AL. The new facility was constructed in an existing building on their 48-acre campus and took roughly seven months to complete. Total demolition of the building’s existing mechanical and plumbing systems was required before the facility could be updated. CSUSASE designed and installed the plumbing, HVAC and compressed air systems along with completed the installation of all new equipment, required by the project scope. Mechanical and plumbing value totaled $3M.