University of West Florida Science Building

CSUSASE was selected to install mechanical and plumbing systems for a new Science Laboratory at the University of West Florida in Pensacola, FL. This project completed in June 2019 and included of installation of 2 AHUs, an air-cooled chiller, chilled and hot water piping for the mechanical systems and roughly 40 fume hoods. Plumbing installations included domestic and deionized water piping, domestic water booster pump, lab air and vacuum and specialty gases ran to 12 high-tech teaching laboratories which include acid waste neutralization equipment. Mechanical and plumbing value totaled $5M.

Comments are closed.